Select files name
—
Select files name
—
Select files name
—
Weekly data source
-
Annual Status Report Year
Applies when weekly data is loaded; updates validation, plots, and results.
Total
Anomalies
Anomalies
0
Across platforms
Unique
Anomalies
Anomalies
0
By Anomaly ID
P1
(High)
(High)
0
Priority = High
Overdue Not
Addressed
Addressed
0
Past required action date
Overdue
Planned
Planned
0
Past required action date
Completed Before Overdue
0
Completed on or before required date
Completed After Overdue
0
Completed after required date
Review
Complete
Complete
0
All findings are present
Review
Pending
Pending
0
Finding present, other fields missing
Closure
Rate
Rate
0%
Blank / empty status → Pending Review · rate excl. Documentation Only
Anomaly Priority Distribution
Breakdown by severity level
Action Status Overview
Current resolution state across all anomalies
Equipment Condition by Platform
Stacked count of condition ratings per platform
Anomalies by Category
Distribution across engineering disciplines
Platform Performance Matrix — Priority vs Status
Heatmap of anomaly count by platform and priority
Critical ranking × Condition Heatmap
Equipment criticality ranking (Inspection Frequency - External) vs condition severity
Category × Condition Heatmap
Normalized anomaly condition severity by engineering category
Elements by Priority
Canonical element types by priority
Top 10 SCE Component
Top 10 SCE components by priority (Unknown excluded). X-axis labels are angled for readability. Bubble size is linear in count vs max in view. Zoom in to enlarge bubbles; double-click chart to reset. Hover for count.
Completion Time by Priority (days)
Inspection → CA completion. Solid line = median; box = quartiles. Whiskers show the range within (Q1 − 1.5×IQR to Q3 + 1.5×IQR).
Gold diamonds = policy targets for P1–P3 (6 / 12 / 24 mo). P4 has no policy marker.
Gold diamonds = policy targets for P1–P3 (6 / 12 / 24 mo). P4 has no policy marker.
Overdue But Not Addressed by Category
Past required action date, by category
Completed After Overdue by Category
Completed after required action date, by category
Overdue and Planned by Category
Past required action date, Action Status = Planned, by category
Completed Before Overdue by Category
Completed on or before required action date, by category
Action Party Distribution
Number of anomalies assigned based on Action
🚨 High-Risk Anomalies
—
🚨 High-Risk Anomalies
—
🚨 High-Risk Anomalies 2
—
⚠️ Backlog Outliers
—
📊 Workload by Assigned To
—
Risk Matrix: Criticality Ranking vs. Priority (Overdue Count)
X = criticality ranking, Y = priority. Overdue = Overdue Not Addressed + Overdue Planned (past required action date) only. Bubble size is for overdue anomalies (relative to max). Zoom in to enlarge bubbles; double-click to reset. Shaded zone = Critical Rank 1–2 × P1–P2 when overdue exists there.
Sub Category × Priority (Overdue Count)
SIM only. X = Sub-category (Other → Primary Structure). Y = Priority. Overdue = Not Addressed + Planned. Size = Overdue Count. Dashed = Primary Structure × P1–P2. Zoom to enlarge.
Sub Category × Severity (Overdue Count)
SIM only. X = Sub-category (Other → Primary Structure). Y = Severity (S1…). Overdue = Not Addressed + Planned. Size = Overdue Count. Dashed = Primary Structure × S1–S2. Zoom to enlarge.
Monthly Inspection Activity
Action Status = Completed — count per month (by Date Inspected)
Monthly Inspection Activity by Platform
Action Status = Completed — count per month by platform (by Date Inspected)
Condition Trend Over Time
Monthly breakdown of equipment condition ratings
Priority Mix Over Time
How anomaly severity distribution evolved
📈
No weekly data loaded. Open Anomaly Trend once to load from clean PPIM/RIM + SIM CSVs, or use Load from Excel instead there.